Bungalow Bathroom Refit in Stone
Fully tanked, level-access wet rooms for accessibility or premium spec.
Bungalow bathrooms in Stone tend to sit on solid concrete floors rather than joists, which changes almost every part of the plan — waste routes are chased into the slab, level-access is easier to achieve, but door widths and turning circles need thinking about from day one.
We refit bungalow bathrooms with future mobility in mind: wider doorsets, blocking noggins for grab-rail fitment later, and lever taps over quarter-turn crossheads.
Plenty of the wet-room conversion we quote across Stone starts the same way: a house that's outgrown its original bathroom layout.
Other services in Stone
Nearby areas we cover from Stone
Nearby places we cover within roughly a 15-minute drive of Stone:
Service radius is approximate and based on our regular weekly routes.
Refit your Stone bungalow bathroom for the long run
Free home survey, solid-floor and doorway assessment, mobility-aware layout options. Call 01782 901390.
- Free survey of structural feasibility in
- Workmanship-guaranteed install on every job
Bungalow bathroom refits across Stone — level access, wider doors, hardware you can still use in 15 years.
What bungalow bathrooms in {town} get wrong
Bungalow owners planning to stay long-term in Stone hit a recurring set of issues with bungalow bathroom refit:
Solid slab waste routes that need chasing — often skipped by general fitters — flagged regularly on Stone jobs.
Standard 686mm doorsets that block later wheelchair access — flagged regularly on Stone jobs.
Cross-head taps that become unusable with reduced hand strength — flagged regularly on Stone jobs.
Around Stone this shows up as old plywood overlay that can't take a tanking membrane.
Steps into existing showers that no longer suit the household, particularly in Stone properties of this age.



What we build in for the next 15 years in {town}
What we commit to on every bungalow bathroom refit job in Stone:
- Blocking noggins fitted for future grab rails on every bungalow refit (standard on every Stone bungalow bathroom refit install).
- Lever taps and thermostatic valves specified as standard, not as an upgrade (standard on every Stone bungalow bathroom refit install).
- For Stone clients: slip-rated finishes on every floor.
- Wet-rooms installed across Staffordshire for OT-led adaptations and private clients on every install we run in Stone.
- Tanking signed off on every install, every Stone job.
Our bungalow bathroom refit process in Stone
You will see the job move through these stages, in this order:
- 11. Survey floor structure, joist direction and drain position, agreed with you before we start in Stone.
- 2Day 2 for a Stone job — lay the former or screed, set falls and dry-fit the linear drain.
- 3Stage 3 on site at Stone: pressure-test, snag and hand over with maintenance notes.
- 4Next on a Stone fit: strip back to floorboard, cut joists and pack a level deck.
- Slip-rated R10/R11 porcelain floor tiles for Stone bathrooms.
- We fit schlüter kerdi or mapei mapegum wps tanking on Stone projects.
Bungalow Bathroom Refit FAQs — Stone
- Is level access easier in a Stone bungalow?
- Usually yes — solid concrete floors take a wet-floor former set into the slab far more cleanly than suspended joists. It's one of the reasons bungalow wet rooms are so popular in Stone.
- Will you widen the doorway if my wheelchair won't fit?
- We coordinate with joiners on doorway widening (typically 762mm to 838mm) when the survey shows it's needed. Structural openings are checked before quote.
- Can I keep a bath and still have step-free shower access?
- Yes — a walk-in bath alongside a level-access shower is a common Stone bungalow layout, particularly for couples with different needs.
- How disruptive is a solid-floor refit?
- Chasing waste into a slab makes noise and dust for 1–2 days at the start. We contain it with plastic zip walls and dust extractors — the rest of the Stone bungalow stays liveable.
- Do you provide a fixed-price quote before starting?
- Always. After a free home visit in Stone we send a fully itemised, fixed-price quotation — no surprises on invoice day.
- How quickly can you start a job in Stone?
- Lead time is usually two to five weeks from a confirmed quote, depending on the spec and our current schedule across the Staffordshire side.