Bathroom & Wet-Zone Tiling · Hanley

Tiled Shower Tray Installation in Hanley

Specialist wall and floor tiling — including large-format and stone.

A tiled shower tray looks better than a resin one, and lasts longer — but only when the substrate, tanking and falls are all right. Get the fall wrong and you get standing water; get the tanking wrong and you get a slow leak into the ceiling below.

We form the tray with pre-fall boards, tank with a manufacturer's kit (not paint-on layered up), and set the linear drain at 12mm below finished tile so water clears in under 3 seconds.

Hanley is one of the areas we work in most weeks — so bathroom & wet-zone tiling jobs here come with a working knowledge of the street layouts.

Bathroom & Wet-Zone Tiling project in a city centre flats property — HanleyBathroom & Wet-Zone Tiling project in a city centre flats property — Hanley — image 2Hanley bathroom — Bathroom & Wet-Zone Tiling finish detail — image 3

Our tiled shower tray installation process in Hanley

We work through it in this order, and you'll know what's happening each day:

  1. 1Step 1 in Hanley: grout with a colour matched to the tile, sponge clean as we go.
  2. 2Set out the room dry to avoid awkward cuts in eye lines (planned per Hanley room).
  3. 3Silicone all internal corners as a movement joint (planned per Hanley room).
  4. 4Stage 4 on site at Hanley: tank wet zones with liquid or sheet membrane.
Materials & methods
  • Schlüter trims for clean external edges — specced for Hanley jobs.
  • Porcelain (rectified, slip-rated where needed) for Hanley bathrooms.

Get a tiled shower tray fitted in Hanley

Formed falls, membrane tanking, linear drain set. Call 01782 901390.

  • Free site survey before quoting in
  • Hand-cut details, not snapped edges

Tiled shower trays across Hanley — formed with pre-fall boards, tanked with membranes, drained in seconds.

Coverage from Hanley
HanleyBirches HeadNorthwoodEtruriaSheltonBurslemStoke

Service radius is approximate and based on our regular weekly routes.

What we build into every {town} tiled tray

What we commit to on every tiled shower tray installation job in Hanley:

  • Pre-fall boards used on every formed tray, no mortar-only falls (standard on every Hanley tiled shower tray installation install).
  • Membrane tanking with taped joints on every wet-zone install (standard on every Hanley tiled shower tray installation install).
  • Stone-care trained — sealing before and after grouting, every Hanley job.
  • Tiled thousands of square metres across Staffordshire — proven across Hanley.
  • Specialists in 1200x600 large-format and 1500x750 slab tile, every Hanley job.

Where tiled trays fail in {town}

Homeowners wanting a formed, tiled-in shower floor in Hanley hit a recurring set of issues with tiled shower tray installation:

Trays formed on flat substrate with mortar 'falls' packed on top — flagged regularly on Hanley jobs.

Paint-on tanking layered without primer or mesh at joints — flagged regularly on Hanley jobs.

Linear drains set too high — water pools before it clears — flagged regularly on Hanley jobs.

Existing tiles drummy and lifting from a failed bed — common on Hanley surveys.

Wrong adhesive on porcelain leaving slow cure and edge cracks, particularly in Hanley properties of this age.

Tiled Shower Tray Installation FAQs — Hanley

Are tiled trays worth the extra cost in Hanley?
For a design-forward bathroom, yes — no acrylic surround, no seam, and the tile runs into the floor uninterrupted. Cost premium is £600–£1,100 over a resin tray for a typical Hanley shower.
What size fall is correct?
1:60 to 1:80 towards a linear drain, or 1:40 to a point gully. We set with a laser and check with water on the day the tray is formed on Hanley jobs.
Which tanking system do you use?
Sheet-membrane systems (kerdi-style) with taped joints — not paint-on that relies on the fitter's technique. Guaranteed by both the manufacturer and us on every Hanley install.
How long does the tray add to the job?
About 2 extra days — one to form and tank, one for the tanking to cure before the tile goes down. Worth it for a 20-year finish.
How quickly can you start a job in Hanley?
Lead time is usually two to five weeks from a confirmed quote, depending on the spec and our current schedule across the Staffordshire side.
Do you tile over existing tiles in Hanley?
Only where the substrate is sound — usually we strip back to plaster or board so the new tiles bed properly and we can tank wet zones first.
Call 01782 901390