Shower Over Bath Installation in Stone
Full bathroom installations, project-managed by one local team.
A shower over the bath in a Stone home is the right answer when you want both, but only if the tiling, screen and thermostatic mixer are all specified for shower duty — not just retro-fitted to a bath setup.
We tank the wall behind the shower zone, fit a proper glass bath screen (not a curtain) hinged into the tile field, and plumb a thermostatic mixer with a diverter rather than a bath-tap-and-riser afterthought.
When Stone homeowners ask us about bathroom fitting, the first thing we look at is the room itself.



Fit a proper shower over your Stone bath
Free survey, tanked wall spec, thermostatic mixer, glass screen. Call 01782 901390.
- Free home survey and fixed-price quote
- Tidy, respectful crews — your home stays liveable
- Project-managed by one team — no chasing trades
Shower over bath installs in Stone done properly — tanked walls, glass screen, thermostatic mixer, no curtain in sight.
Nearby areas we cover from Stone
Our vans cover a tight radius — Stone sits centrally, with frequent jobs in:
Service radius is approximate and based on our regular weekly routes.
Where Stone sits on our patch
Stone (ST15) falls under Stafford Borough Council in Staffordshire. Stone is a Georgian canal-side market town — sash-windowed townhouses in the centre, Victorian villas on Stafford Road, plus large modern estates at Walton and Yarnfield. It's reached easily via A34 and A51, putting it inside our regular daily route.
Shower-over-bath mistakes in {town}
Households keeping a bath but adding a proper shower over it in Stone hit a recurring set of issues with shower over bath installation:
Shower fitted with only a curtain — water on the floor after every use — flagged regularly on Stone jobs.
Wall behind the bath not tanked — moisture into the substrate within a season — flagged regularly on Stone jobs.
Bath tap and riser instead of a thermostatic mixer — scald risk when tap opens elsewhere — flagged regularly on Stone jobs.
Stone: layouts that waste a tiny footprint — door swings, basin position, awkward stud walls.
Stone: old cast-iron waste runs that throttle drainage on a new shower.
Our shower over bath installation process in Stone
Every Bathroom Fitting job follows the same disciplined order — so nothing gets missed:
- 1Step 1 in Stone: itemised fixed-price quotation with product brands listed line by line.
- 2Stage 2 on site at Stone: tanking and waterproofing before any tile goes on a wet zone.
- 3Step 3 in Stone: free home survey to measure, photograph and talk through your options.
- 4Wall and floor tiling by hand, including diamond-cut details (planned per Stone room).
- Mapei rapid-set adhesives and SP coloured grout for Stone bathrooms.
- Thermostatic mixer valves and concealed shower bodies for Stone bathrooms.
Shower Over Bath Installation FAQs — Stone
- Do I need to re-tile the Stone bathroom to add a shower over the bath?
- The shower wall(s), yes — they need tanking and full-height tiling. The rest of the room only if it's cosmetically time.
- Glass screen or shower curtain?
- Glass — a hinged 6-8mm screen fixed into the tile field. Curtains dribble water onto the floor on every use and rarely last 12 months in a Stone bathroom.
- Thermostatic mixer or standard?
- Thermostatic — anti-scald, stable temperature when someone else runs a tap elsewhere. Standard on every Stone shower-over-bath install.
- How long does it take?
- 4-6 working days on a standard Stone install if we're re-tiling one wall and fitting the screen and mixer.
- Do you tidy up at the end of each day?
- Yes — dust sheets stay down, the room is hoovered daily and we leave your Stone home liveable while the work runs.
- How long does a full bathroom in Stone typically take?
- A standard family bathroom in Stone is usually 7 – 12 working days from strip-out to handover, depending on tiling area and structural changes.
