Bathroom Flooring Installation in Hanley
Specialist wall and floor tiling — including large-format and stone.
The bathroom floor takes more water and traffic than any other floor in the house. Whichever finish a Hanley client picks — LVT, porcelain, natural stone, micro-cement — the substrate underneath does the real work.
We isolate timber floors with a decoupling membrane, self-level any dips over 3mm, and ensure the tile or plank is bedded on the right adhesive for the movement it'll see. No lifted corners in year two.
Most of our bathroom & wet-zone tiling jobs in Hanley begin with a slow walk round the house, not a quote on the doorstep.
Our bathroom flooring installation process in Hanley
Here's how the job actually runs in your house:
- 1Day 1 for a Hanley job — set out the room dry to avoid awkward cuts in eye lines.
- 2Stage 2 on site at Hanley: tank wet zones with liquid or sheet membrane.
- 33. Grout with a colour matched to the tile, sponge clean as we go, agreed with you before we start in Hanley.
- 4Step 4 in Hanley: silicone all internal corners as a movement joint.
- Porcelain (rectified, slip-rated where needed) for Hanley bathrooms.
- Schlüter trims for clean external edges for Hanley bathrooms.
Bathroom Flooring Installation FAQs — Hanley
- Which flooring is best for a Hanley family bathroom?
- Porcelain for durability and re-sale value; LVT for warmth underfoot and quieter feel; micro-cement for a seamless modern look. All work in Hanley bathrooms — we bring samples to the survey.
- Can flooring go over the existing floor?
- Sometimes for LVT if the existing is sound and flat, never for stone or heavy porcelain. We survey and photograph condition before quoting.
- Do you use a decoupling membrane?
- On every suspended timber floor in a Hanley bathroom — decoupling isolates tile from timber movement and stops grout cracking. Included, not upsold.
- How long does bathroom flooring take?
- 1–2 days for LVT, 2–3 days for tile with membrane, 3–5 days for micro-cement including cure time. Fixed schedule after survey.
- Are you fully insured for work in Hanley?
- Yes — we hold full public liability cover and every job in Hanley comes with a written workmanship guarantee.
- Do you tidy up at the end of each day?
- Yes — dust sheets stay down, the room is hoovered daily and we leave your Hanley home liveable while the work runs.
Other services in Hanley
Related pages
Where {town} bathroom floors fail
Homeowners wanting a durable, waterproof bathroom floor in Hanley hit a recurring set of issues with bathroom flooring installation:
Tile laid directly onto flexing timber floors with no decoupling — flagged regularly on Hanley jobs.
LVT stuck onto self-levelling compound that wasn't primed — flagged regularly on Hanley jobs.
Grout hairline-cracking in year two because the sub-floor was skipped — flagged regularly on Hanley jobs.
Worth checking in your Hanley bathroom: movement joints missing where the floor meets the wall.
Existing tiles drummy and lifting from a failed bed. We see it often enough in Hanley to plan for it.
What we prep on every {town} floor install
What we commit to on every bathroom flooring installation job in Hanley:
- Decoupling membrane on every timber sub-floor (standard on every Hanley bathroom flooring installation install).
- Self-level and prime tested before any adhesive goes down (standard on every Hanley bathroom flooring installation install).
- Tiled thousands of square metres across Staffordshire on every install we run in Hanley.
- Stone-care trained — sealing before and after grouting, every Hanley job.
- Specialists in 1200x600 large-format and 1500x750 slab tile on every install we run in Hanley.



Coverage around Hanley
Within a short drive of Hanley we regularly fit bathrooms in:
Service radius is approximate and based on our regular weekly routes.
Refit your Hanley bathroom floor properly
Free survey, substrate levelled, decoupling included. Call 01782 901390.
- Specialists in large-format and natural stone
- Tile-only or supply-and-fit options in
Bathroom flooring across Hanley — LVT, porcelain, stone, micro-cement — laid on a substrate that will actually hold it.
